Detection | Photovoltaic power station testing project content and acceptance standards

Photovoltaic power stations, also known as solar photovoltaic power stations, refer to photovoltaic power generation systems that are connected to the grid and transmit electricity to the grid. Photovoltaic power plants have become an important source of electricity supply worldwide, and regular testing cannot be ignored to ensure their efficient and safe operation.

Photovoltaic power station testing project content

The testing content of photovoltaic power plants involves multiple aspects, which need to be evaluated and tested through professional testing equipment and testing technology to ensure the normal operation and safety of the power station. The main items of photovoltaic power station testing and acceptance are as follows: 1. Document verification: basic information of the project; basic documents; contract compliance of power station equipment; 2. Construction quality verification: verification of actual installed capacity; photovoltaic module inspection; Combiner box inspection; AC and DC distribution cabinets, box transformer inspection; photovoltaic bracket/photovoltaic array field/inverter room inspection; Connecting cable inspection; grounding flat steel welding and anti-corrosion paint; Electric shock protection and ground protection inspection; monitoring system inspection; 3. Power station performance test: electrical performance test of photovoltaic modules; infrared detection; (IR test), (IV test); Electroluminescence Characteristic Test (EL); photovoltaic array insulation resistance; grounding resistance and grounding continuity test of photovoltaic power stations; polarity test; string working current test, string power test; Inverter efficiency, inverter power quality test; thermal imaging test of electrical connections in the station; bracket galvanizing test; Dust power loss; Power station system energy efficiency ratio (PR) test;

Acceptance standards for photovoltaic power stations

GB/T 50796-2012 Acceptance specification for photovoltaic power generation projects GB 50797-2012 Design specification for photovoltaic power station GB 50794-2012 Construction specification for photovoltaic power station GB/T 20513-2006 Guidelines for measurement, data exchange and analysis of photovoltaic system performance CNCA/CTS 0004-2010 Basic requirements for acceptance of grid-connected photovoltaic power generation system engineering CNCA/CTS 0016-2015 Technical specification for performance testing and quality evaluation of grid-connected photovoltaic power stations CQC 9102-2012 Technical requirements for evaluation of photovoltaic power generation systems CGC/GF 003.1:2009 Basic requirements for engineering acceptance of grid-connected photovoltaic power generation systems IEC 62446:2009 Basic requirements for documentation, commissioning testing and inspection of grid-connected photovoltaic power generation systems IEC 62446-1-2016 Requirements for testing, documentation and maintenance of photovoltaic (PV) systems Section: Grid-connected systems Documentation, commissioning and inspection

Related Post

8 月 28, 2025

反内卷,光伏的拐点即将到来

On the evening of August 19, the official Weibo of "Industry and Information Technology Weibao" broke news that the Ministry of Industry and Information Technology, the Ministry of Social Work of the Central Committee, the National Development and Reform Commission, the State-owned Assets Supervision and Administration Commission of the State Council, the State Administration for Market Regulation, and the National Energy Administration jointly held a symposium on the photovoltaic industry on the same day to further standardize the competition order of the photovoltaic industry. According to the official statement of the official Weibo of "Industry and Information Technology Weibo" on the evening of the 19th, the heads of relevant photovoltaic manufacturing enterprises and power generation enterprises, the China Photovoltaic Industry Association, and relevant local industry and information technology departments attended the meeting. Different from the caliber of the "Industry and Information Technology WeChat" symposium on July 3, the official release…

了解更多
8 月 28, 2025

光伏电站中检测到的主要内容是什么?

1. Core equipment testing is the foundation, photovoltaic modules need to be visually inspected for cracks, hidden cracks (EL test), occlusion and hot spots (infrared thermal imager), and open circuit voltage and power attenuation are measured; The inverter monitors input and output parameters, temperature and fault alarms, and tests the conversion efficiency and harmonics. The combiner box checks the overheating of the fuse and wiring, and tests the lightning protection module. 2. Electrical system testing covers distribution cabinet wiring, three-phase balance, cable insulation resistance and laying conditions; The grounding system measures the grounding resistance (≤4Ω) and checks the connection reliability. Lightning protection facilities test the operation performance of lightning rods, down conductors and lightning protectors. 3. Performance and environmental monitoring The power generation is counted through the SCADA system, and the loss is analyzed compared with the theoretical value. Monitor irradiance, ambient and component temperature, and wind speed to optimize…

了解更多

高效的图像批量识别

匹配的AI自动识别和诊断软件具有更优秀的处理能力